Power infrastructure

Energy

Power routes being paired with compute projects across the Grid.

Active energy lanes3Validated or under active evaluation
Preparing energy lanes19Requirements being developed
Kenya scale path100 MWPower architecture tied to Nairobi scale

Power routes

Energy under evaluation

AngolaActive

Hydro-linked power and Atlantic connectivity are part of the deployment thesis under diligence.

KenyaActive

Utility, hydro, geothermal and renewable pathways are being compared against uptime, economics and expansion requirements.

NigeriaValidated

Existing baseload energy infrastructure is being assessed for AI/HPC suitability and expansion economics.

AlgeriaPreparing

Power, reliability and expansion economics are being mapped before a site is promoted into diligence.

BotswanaPreparing

Power, reliability and expansion economics are being mapped before a site is promoted into diligence.

Côte d’IvoirePreparing

Power, reliability and expansion economics are being mapped before a site is promoted into diligence.

Democratic Republic of the CongoPreparing

Power, reliability and expansion economics are being mapped before a site is promoted into diligence.

EgyptPreparing

Power, reliability and expansion economics are being mapped before a site is promoted into diligence.

EthiopiaPreparing

Infrastructure requirements will be set after the first qualified deployment route is chosen.

GhanaPreparing

Power, reliability and expansion economics are being mapped before a site is promoted into diligence.

MauritiusPreparing

Power, reliability and expansion economics are being mapped before a site is promoted into diligence.

MoroccoPreparing

Power, reliability and expansion economics are being mapped before a site is promoted into diligence.

NamibiaPreparing

Power, reliability and expansion economics are being mapped before a site is promoted into diligence.

RwandaPreparing

Power, reliability and expansion economics are being mapped before a site is promoted into diligence.

SenegalPreparing

Power, reliability and expansion economics are being mapped before a site is promoted into diligence.

SomaliaPreparing

No public infrastructure route is selected yet; requirements follow the qualified workload.

South AfricaPreparing

Power, reliability and expansion economics are being mapped before a site is promoted into diligence.

TanzaniaPreparing

Power, reliability and expansion economics are being mapped before a site is promoted into diligence.

TunisiaPreparing

Power, reliability and expansion economics are being mapped before a site is promoted into diligence.

UgandaPreparing

Power, reliability and expansion economics are being mapped before a site is promoted into diligence.

ZambiaPreparing

Power, reliability and expansion economics are being mapped before a site is promoted into diligence.

ZimbabwePreparing

Power, reliability and expansion economics are being mapped before a site is promoted into diligence.

Energy mix

Power is part of the compute design.

Hydro

High-availability routes under evaluation in multiple deployment pathways.

Geothermal

Kenya offers a deep renewable baseload option for larger AI infrastructure.

Utility + hybrid

Grid, redundancy and hybrid generation are compared against uptime and economics.